Centre plans GIS-based digital registry to track India's rural road infrastructure

India plans a GIS-enabled asset database for PMGSY roads, bridges and culverts to monitor conditions, maintenance, connectivity gaps and future rural road needs.

By
TRT Editorial
TRT Editorial is your early-morning voice for the latest headlines. With a sharp eye for current events and a passion for clarity, TRT Editorial delivers concise, engaging...
6 Mins Read

The Centre is preparing to introduce a GIS-based digital registry for rural road infrastructure, creating a centralised database of roads, bridges and culverts built under the Pradhan Mantri Gram Sadak Yojana (PMGSY).
The proposed registry is intended to move rural road management beyond project-by-project monitoring towards tracking infrastructure across its entire lifecycle. The system would use Geographic Information System (GIS) mapping to record the location and condition of individual road assets, along with their maintenance history and infrastructure gaps.
The move comes as the government shifts greater attention towards maintaining the large rural road network already built under PMGSY, while continuing to expand connectivity to unconnected habitations.

Centre moves to create a digital map of rural road assets

The proposed platform will create a nationwide digital inventory of rural road infrastructure, allowing authorities to view roads, bridges and culverts through a common geospatial database.
According to officials, the initiative is being developed by the Ministry of Rural Development to address fragmented records maintained by different states and agencies. By linking individual infrastructure assets with precise geographic information, officials could access a more complete picture of the rural road network from a single platform.
The registry is expected to capture information that can help authorities understand where infrastructure exists, its current condition and where gaps remain. This could make it easier to compare existing connectivity with the infrastructure needs of rural areas.

Registry will track roads beyond the construction stage

The proposed system is significant because it is designed to function as an asset-management platform rather than simply a record of completed projects.
Roads require periodic maintenance after construction, and their condition can change because of weather, traffic and other factors. A digital record containing maintenance and condition-related information could help authorities identify assets that require attention and prioritise repair work.
The approach would also complement existing digital systems used under PMGSY. The government already uses the Online Management, Monitoring and Accounting System (OMMAS) for programme monitoring, while eMARG is used for maintenance management, including planning, inspections, performance-based payments and monitoring of maintenance works.

Why maintenance is becoming as important as building new roads

The scale of India's rural road network makes the maintenance of existing infrastructure an increasingly important part of rural connectivity. 

InfrastructureFY 2025–26 (Completed)FY 2026–27 (Targeted)
Rural roads15,647.78 km26,474 km
Bridges1,0421,375
Habitations connected932,400
Under PMGSY,2,905 roads covering 15,647.78 km, along with 1,042 bridges, were completed during FY2025-26. Additionally, another 93 eligible habitations were provided with all-weather road connectivity during the year.
The target for FY2026-27 has been set at 26,474 km of rural roads and 1,375 bridges along with providing connectivity to 2,400 eligible habitations. The implementation plan also specifically mentions strengthening maintenance of the constructed road infrastructure.
This focus on strengthening rural connectivity is also reflected at the state level, with Gujarat recently allocating ₹2,609 crore to strengthen its rural road network.
A central digital registry could help bring those assets into a common monitoring framework.

PMGSY's expanding network increases the need for better asset management

PMGSY has evolved considerably since it was launched to provide all-weather road connectivity to eligible unconnected rural habitations.
The first phase connected 1,62,876 habitations. Subsequent phases included upgrading existing rural roads and consolidating key rural routes linking habitations to agricultural markets, schools and hospitals. The PMGSY-IV launched in September 2024 proposes to provide connectivity to 25,000 additional unconnected habitations by 2029.
A GIS-based inventory can provide a common frame of reference in such decision-making processes, particularly in the context of roads spanning multiple states and administrative agencies. 

How the digital registry could influence future rural infrastructure planning

If implemented effectively, the registry could help shift rural road planning towards decisions based on the condition and location of existing infrastructure.
Authorities could use geospatial information to identify areas with inadequate connectivity, compare infrastructure gaps and prioritise maintenance or new projects. A common digital record could also improve coordination between the Centre and states when planning investments in rural roads.
The system would complement existing monitoring mechanisms by providing a broader digital record of rural road assets. Its value will ultimately depend on how regularly road conditions and maintenance records are updated and how effectively different agencies use the information.
For India's rural infrastructure network, the proposed registry therefore represents a shift in emphasis: from keeping track of how many roads are being built to understanding how the country's rural road assets perform over time.

Sources: Mint

Share This Article
Recommended Stories